The Sarah Apartments
PROJECT DESCRIPTION:
The Sarah project is a 16.1 acre multi-family site consisting of 270 apartment units in 21 buildings, a clubhouse with pool, maintenance building, and various detached garage buildings. Our team designed the water, wastewater, storm sewer infrastructure, and two (2) batch detention ponds along with overall site grading and paving. The site is located over the Edwards Aquifer Contributing Zone so a Contributing Zone Plan (CZP) was required to be permitted through the Texas Commission on Environmental Quality (TCEQ). This project also required a separate Public Improvements Construction Plan submittal for a deceleration lane for access off Ronald Reagan and 10’ wide pedestrian trail along the entire ~1,500’ Ronald Reagan frontage.
![]() |
---|
Location
Near the intersection of Ronald Reagan Boulevard and Sarita Drive in Leander
Client
CESM Real Estate
Our Role
Primary Civil Engineering
Project Type
Multi-Family
Contract Period
October 2016-Present
Project Cost
Est $4M for Civil Site Infrastructure
Project Scope:
Final Platting Support
Civil Engineering Design and Permitting
Public Improvements Construction Plans
Construction Phase Services